Great Man made River Stadium

DESCRIPTION

An old lybian stadium needs to be renovated. Our scope was focused on verification of existing constraints in order to provide the parametric model of steel roof.

FACTS

CLIENT

Lybian Olympic Committee - FIP Industriale

LOCATION

Tripoli, Lybia

PARTNERS

Ing. Marco Mantoan - E2B srl

ROLE

Project Delivery Systems, Design Optimization, Parametric Design

CONTACTS

For more information about this project, please contact:

MNTP S.r.l.
Via Garibaldi 129
35028 Piove di Sacco, Padua Italy
P:+39 049 9701343

PROJECT DELIVERY

Project Delivery Systems
Implementation of the data-flow through 3D modeling to improve the way of working of architects, engineers and builders
Details

DESIGN OPTIMIZATION

Design Optimization
Integration of BIM models, mathematical techniques and fabrication procedures to achieve optimization of any kind of complex shape
Details

PARAMETRIC DESIGN

Parametric Design
Implement the relationship between design intent and design responsive to control construction phase

Details